06 September 2019
The electrodeposition production section was put into operation
06 September 2019
Seal Maker CNC System SML850e Plus
06 July 2019
The second production line of “Promtube” Production Company was put into operation.
06 May 2019
KF 5600С vertical machining
06 February 2019
AEGI Clamps