Введите запрос!
ru

History

2024
  • Opening of a new workshop with an area of 1000 square meters for the production of blanks made of polyurethane, rubber, and fluoroplast. Opening of the laboratory.
  • Opening of a 450 square meter seal sales department office.
  • Opening of a new modern dining room for our staff.
  • Opening of a new branch in Odintsovo.
2023
  • Opening of a new production facility, a workshop measuring 2,500 square meters. A cylinder repair and production building with a new large and bright design office.
  • Opening of a new branch in Nizhny Novgorod.
2022
  • The opening of a new direction “laser surfacing” is a robotic laser complex that allows you to work with large-sized parts
  • Construction of a new production facility dedicated to the production of hydraulic cylinders
  • The production of general and special purpose polyurethane blanks using advanced technologies, raw materials and equipment has been mastered
2021
  • In order to provide express repair services, a separate site has been allocated in our production for urgent repair of hydraulic cylinders.
  • Commissioning of a power press for straightening shafts at the production site of chrome rods with HDPE
  • A site of own production of polyurethane blanks with a diameter of up to 1600 mm has been organized.
  • Opening of a branch in Novosibirsk
2020
July

The second production stage of the Promtube production company has been launched.

2020
May

A vertical machining center of the KF 5600 brand from HYUNDAI, manufactured in South Korea, was put into operation at the site of CNC machines.

2020
February

Conclusion of a cooperation agreement with the Italian company for the production of clamps for high-pressure pipes AEGI Clamps.

2019
December

The certificate of the official representative in the territory of the Russian Federation from the Swiss partner Dichta SA is received.

2019
November

The construction of a new workshop for the production of sealing elements (Seals) has been completed.

2019
August

The electroplating production site has been launched.

2019
July

The second production stage of the Promtube production company was launched.

2019
May

A vertical machining center of the KF 5600C brand from HYUNDAI, manufactured in South Korea, was put into operation at the site of CNC machines.

2019
February

Conclusion of a cooperation agreement with the Italian company for the production of clamps for high-pressure pipes AEGI Clamps.

2019
October

Conclusion of a cooperation agreement with the Italian company for the production of high-pressure tube clamps AEGI Clamps.

2018
October

Commissioned a new building designed for office and welfare premises.

2018
April

Commissioned a unit for rod induction hardening.

2018
January

Increased the production capacity of the seal production area. Commissioned another SML 500e Plus automatic system made by Seal Maker Produktions-und Vertriebs GmbH (Austria).

2017
December

Commissioned a new warehouse complex for the storage of precision tubes and chrome-plated rods with an area of about 3000 sq. m.

2017
September

Increased the pool of turning and milling machines by a new vertical machining centre with permissible table placement size of 1600x650 mm and maximum weight of machined parts up to 1300 kg.

2017
May

Obtained a distributor status with Seal Maker Produktions-und Vertriebs GmbH (Austria).

2017
March

Commissioned a thermal section with a high-temperature horizontally loaded chamber furnace and a highly accurate temperature setting, as well as a quenching bath for heat treatment in an oily working environment.

2017
February

Received an official confirmation of the status of an exclusive distributor of Salzgitter Mannesmann Precision GmbH (Germany) for the supply of seamless cold-drawn precision pipes according to EN 10305-4/DIN 2391.

2017
January

Obtained a certificate of a manufacturer of hydraulic cylinders for marine shipbuilding from the Russian Maritime Register of Shipping.

2016
September

Obtained the status of an official representative of Semperrflex, Austro-Czech enterprise, in the territory of the Russian Federation in the sphere of Semperit hydraulic and industrial hoses.

2016
November

Commissioned a new, high-performance horizontal boring machine equipped with a Mitsubishi CNC with a 24-position tool drum.

2016
May

Commissioned a new administrative and amenity building with an area of about 500 sq.m.

2015
November

Signed an exclusive agreement on the right to represent products of NIMET, a manufacturer of chrome-plated bars, on the territory of Russia, Armenia, Kazakhstan.

2015
September

Concluded a supply contract for high-pressure hydraulic pipes with Mannesmann AG (Germany), a large European manufacturer.

2015
August

Assembled a new semi-automatic CNC lathe at the mechanical production of OOO PTK KRPMS, that provides for expanding the range of standard sizes for repairing and manufacturing hydraulic cylinders.

2015
May

Mastered the production of telescopic hydraulic cylinders of unique design. In order to expand the size range of telescopic hydraulic cylinders for mechanical production, we purchased a circular grinding machine, that makes it possible to machine parts with a diameter up to 400 mm, length up to 2,520 mm and weight up to 1000 kg.

2015
April

Passed certification on compliance with the requirements of the World Trade Organization (WTO) related to application of uniform international rules and regulations to process management and overall company’s management.

2014
August

Started cooperation with CIDAT SpA, a well-known Italian manufacturer of hydraulic and industrial hoses and connections.

2014
March

Signed a cooperation contract with one of the world leaders in production of hydraulic and pneumatic seals, AS Aston Seals.

2014
February

Established a new representative office of the company - Moscow branch, offering its customers a full list of products, including hydraulic cylinders, fittings and high-pressure hoses, imported and domestic seals.

Commissioned a warehouse for storing large lots of seals of all sizes.

2014
January

Mastered the repair of complex hydraulic equipment - vibratory pile drivers manufactured by ICE (Holland), designed to drive into the ground and extract various pile elements; this equipment consists of a hydraulic station driven by a Cummins diesel engine, a vibratory unit and grippers.

2013
December

Commissioned a new warehouse with an area of 1,800 square meters for storing bars and tubes, fully equipped with modern specialized equipment.

2012
June

Participation in STT-2013 annual international exhibition of construction vehicles, equipment and technologies, which brought together the largest manufacturers and suppliers of vehicles, equipment, components from Russia and 30 other countries.

2013
May

OOO Staltube started promoting the products of OOO PTK KRPMS in Izhevsk, and PK PromTube – in Bashkiria, Tatarstan, Udmurtia and the Kirov region.

2013
January

Further expansion of the machine pool: purchased a CNC lathe, which allows for machining parts up to 3,000 mm long with a diameter up to 500 mm, and a CNC milling centre. Purchasing new equipment expands the engineering capabilities of the company, makes it possible to fulfil our customers’ orders better and quicker.

2012
December

Agreement concluded between STELMI ITALIA SpA and OOO PTK KRPMS on exclusive representation of the company in Russia, Belarus, Kazakhstan.

2012
October

Official certificate given including the company in the register of members of the Non-Profit Partnership (self-regulatory organization) Manufacturers of Road-Building, Utility and Ground-Based Aerodrome Equipment.

2012
August

Agreement concluded with Bryansk Aggregate Mechanical Plant Closed Joint-Stock Company on representing the interests of OOO PTK KRPMS and OOO PK Promtube for the sale of honed tubes, hollow and solid bars in the Bryansk, Smolensk and Oryol regions.

2012
May

During "Construction Equipment and Technologies 2012" specialized exhibition, at the general annual meeting of AGPO members, OOO PTK KRPMS joined the Association of Hydraulic Equipment Manufacturers (AGPO), bringing together plants manufacturing hydraulic units and organizations for the promotion of engineering hydraulics on the mobile equipment and industrial equipment market.

2012
April

A new assembly workshop commissioned. An area of 1500 sq.m. comprised a welding area, an ultrasonic washing section, a powder coating section, an assembly and testing section. New equipment was purchased to equip the workshop.

2012
January

The company received and installed a CNC tube lathe.

2011
July

A contract was concluded with Hyva Rusland on the creation of a service centre for maintenance of HYVA hydraulic equipment on the basis of OOO PTK KRPMS.

2011
March

A new assembly workshop started working on March 21, 2011. The workshop area is 1100 square meters.

A honing machine was purchased, which allows to hone tubes for manufacture of cylinder tubes with internal diameter from 25 mm to 500 mm and with length up to 8000 mm.

HYUNDAI-KIA SKT300LM CNC turning and milling machine was purchased, which enables machining parts with diameter up to 500 mm, length up to 1260 mm.

2010
December

Сompany employees trained in Austria at Seal Maker; high-performance equipment SML 500e Seal Maker was purchased—a revolutionary integrated CNC system expanding the boundaries of the sealing manufacturing technology.

2010
October

Purchased a vertical machining centre. V 1000 machine is designed for machining parts by vertical milling and drilling.

2010
June

Commissioning of a new warehouse building.

Negotiations held on cooperation with major European companies specializing in manufacturing precision chrome-plated and nickel-plated bars and tubes for hydraulic cylinders: NIMET (Romania), STELMI (Italy). Agreements were concluded.

2009
May

The list of spare parts suggested by OOO PTK Kalugaremputmash-Servis for delivery under the import substitution program in order to minimize purchases of import products was developed and approved by the Department of Railways and Structures at JSC Russian Railways, Project and technology engineering department for tracks and track machines - branch of Russian Railways. On the initiative of General Director D.V. Vasilyev, the main nomenclature of imported hydraulic cylinders was replaced by domestic analogues, which allowed the company to get a grip as the main supplier on the Russian railways network for many years.

2008
July

The company was certified according to the quality system GOST R ISO 9001-2001 (ISO 9001-2000).